On most LNG ships, the manifold is drained via the spray header to a cargo tank. Check that the spray valves are open on one tank and that all relevant line valves leading to the tank are open. 2. Isolation of Liquid and Vapour Valves Either Side of the Manifold Connection. For the shore side, this means closing the valve at the base of the MLA.