资讯
KARACHI: National Transmission and Despatch Company (NTDC) has successfully commissioned 600MVA transformer at 500kV... AVN 53.48 Decreased By -0.42 (-0.78%) BAFL 30.59 Increased By 0.19 (0.63%) ...
ZHENJIANG, China, December 17, 2024--(BUSINESS WIRE)--On December 16, 2024, the capacity expansion and replacement work of the No. 1 main transformer at the 500kV Shangdang Substation, a vital hub ...
Main Transformer Capacity Upgrade Project of 500kV Shangdang Substation in Zhenjiang, Jiangsu Is Officially Commissioned. December 17, 2024 12:05 AM Eastern Standard Time.
State Grid Zhenjiang Power Supply Company Initiates Capacity Expansion and Replacement of Main Transformer at 500kV Shangdang Substation. October 29, 2024 05:11 AM Eastern Daylight Time.
The second 500-kilovolt transformer station was put into operation in Beijing on Thursday ahead of the 2008 Olympic Games. Chengbei Transformer Station, the first 500-kv transformer station ...
ZHENJIANG, China, December 17, 2024--(BUSINESS WIRE)--On December 16, 2024, the capacity expansion and replacement work of the No. 1 main transformer at the 500kV Shangdang Substation, a vital hub for ...
ZHENJIANG, China, October 29, 2024--(BUSINESS WIRE)--On the evening of October 27, 2024, a brand-new Chinese-made 500kV transformer was successfully transported into the 500kV Shangdang Substation in ...
The total cost of the project was ₹1.97 crore with Bescom contributing ₹1.33 crore, which includes installing a 500 KV dry type transformer, 8-way solid RMU, 5-way LT distribution panel, 2 KV ...
一些您可能无法访问的结果已被隐去。
显示无法访问的结果